Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the bauen domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/hellenicvibes.gr/technek/wp-includes/functions.php on line 6260
ΦΩΤΟΒΟΛΤΑΙΚΟ 5MW - Τεχνική - Κατασκευαστική Εταιρεία Αθήνα - ΤΕΧΝΕΚ Α
PROJECT TYPE

Energy

SOLAR PARK 5MW

Solar Park in Peloponnese (Kourtesi): Our company was selected by CANTREVA Ltd. (Main contractor of the project) for the supply and installation, of the metal bases made of German factory MUPRO GmBH, on a concrete pile.   

The owner of the park is the Italian ENEL. The completion work, including the concreting, which was done by our company, lasted 3 months. The concreted stakes amount to 10,600 pieces.